
This is a picture of the International Airport right after it was
opened in 1964. Our firm, a partnership of Engineers and Architects, designed
the buildings and managed the contracts for the complete project. This
was the first Jet Age Air Terminal to be built in Canada and was complete
with all of the facilities to be found in Terminals that have been built
since that date. There have been a number of additions to it since it's
opening. The present day Airport is shown in the next picture.
This is a picture of the airport as it presently exists. At the far right are another three bulding where we designed and managed construction contracts. They are the Air Canada Maintenance Base, the Air Canada Hangar and the Air Canada Freight Center.
